top of page
Equiptec-royal-Blue.png
IMG_0977.HEIC
IMG_1630.heic
wall steel stud framing with headers for glass walls.HEIC
IMG_2424.HEIC
IMG_0065.HEIC
full height wall furr-out.HEIC
IMG_0696.HEIC
IMG_0962.HEIC
compressor pad with slotted fence enclosure .HEIC
nice zoom out 2.jpg

Full Capacity General Contractor

Equiptec specializes in turn-key, design build requirements, as well as pre-engineered plan and spec projects. We are able to take your concepts and visions from the initial architectural, engineering and design phase to permitting and liaison with building, fire, and other regulatory agencies. Our team coordinates, manages, or self performs all required trades including: plumbing, electrical, HVAC, millwork, carpentry, drywall and any required structural bracing, modification or upgrades for basic Market Ready, Class A office tenant improvements and industrial build-outs.

nice zoom out .jpg
CER.jpg
CER4.jpg
Nice outside in long conference room.jpg
CER4.jpg
CER8.jpg
Breakroom 2.jpg

Project Spotlight

ICI 2nd Floor Humidity Controlled CER

Date: October 2021

Client:  Imperative Care Inc.

Industry: Medical Device Manufacture

imperative_care-v2.png

Services provided: Design, Cleanroom, CER, Permit, Fire Sprinkler, Fire Alarm, Flooring, Restroom Core, Breakroom, Lab, Structural Modifications, Humidity Control, BMS, Magnehelic Gauges, Interlock System, Doors, Millwork, Lab Furniture, T-bar, Electrical, HVAC, Roofing

Description and objective

This was the 3rd CER that Equiptec has built for Imperative Care Inc (ICI). ICI required a 3,500 sqft CER to manufacture different parts of their product with an additional 1,000 sqft CER that has humidity control. Equiptec demoed the existing space and provided 1” thick concrete subfloor repair throughout. All HVAC units were removed and replaced with new. The CERs were built with a large Gowning Room, Combine Material Transfer Room, Large CER and Small Humidity Controlled CER with Touchless Automatic Sliding doors w/ Interlock System, Electronic Magnehelic Gauges measuring the pressure in each room to ensure proper pressure cascade.

This Build included a new Class A Breakroom, Restroom Core, Open Office, Lab Space and 2nd Floor Exterior Loading Dock so that the tenant could move new equipment in and out of the space as needed without disassembling the exterior glass.

bottom of page